Schedule a Call Back
During these days of abnormal power-cuts, saving electricity is paramount, as is avoiding its use where there is a better substitute. For example, a cooling tower used in any process industry has a fan motor which consumes electricity and its capacity goes on increasing the moment the size of the cooling tower increases. This can be avoided by using Armec Jet Towers which are Fan less and Fill less. This in itself is boon during these days of electricity shortage at all India level for industries in general. Even the entire expenditure incurred on such towers can be recovered in less than 2 years operation. Assuming that a 1 HP fan motor is used for 300 days of continuous operation at Rs 5.50 per electrical unit, the energy cost is: 0.746 x1 x 300 x 24 x 5.50 = Rs 29,542.00. For 10 HP motor, it will be Rs 2,95,416.00, and for 100 HP, Rs 29,54,160.00/- When the cooling tower is large this saving matters to a large extent. Further, more than the savings what matters most is the interruption of the continuous process in industry for a trivial reason like cooling tower fills are choked up. When one adds on the maintenance and periodic revamping cost of conventional cooling towers, Jet cooling towers pay back period come down to 6 to 8 months.
INDUSTRIAL PRODUCTS FINDER (IPF) is India’s only industrial product portal. Referred to as the ‘Bible’ of the manufacturing sector in India,
INDUSTRIAL PRODUCTS FINDER (IPF) is India’s only industrial product portal. Referred to as the ‘Bible’ of the manufacturing sector in India,
Hi There!
Now get regular updates from IPF Magazine on WhatsApp!
Click on link below, message us with a simple hi, and SAVE our number
You will have subscribed to our Industrial News on Whatsapp! Enjoy
Schedule a Call Back