Zetwerk bags Rs 126 cr order from L&T for Bullet Train Project

  • Industry News
  • Apr 21,22
Zetwerk will supply 10,000 MT fabricated girders, which will support the load-bearing capacity of the steel bridges that L&T is fabricating for laying the Bullet Train rail corridor
Zetwerk bags Rs 126 cr order from L&T for Bullet Train Project

Bengaluru

Zetwerk Manufacturing Businesses - world's largest managed marketplace for contract manufacturing - has been awarded a Letter of Intent (LoI) for an order worth Rs 126.55 crore by L&T Ltd for the Mumbai-Ahmedabad (MAHSR) Bullet Train project. 

As per the LoI, Zetwerk will supply 10,000 MT fabricated girders, which will support the load-bearing capacity of the steel bridges that L&T is fabricating for laying the Bullet Train rail corridor. 

The MAHSR Bullet Train project is being executed by the National High Speed Rail Corporation Ltd. Larsen & Toubro – IHI Infrastructure Systems Consortium will fabricate & transport 28 steel truss bridges (approx. 70,000 MT) on the 508-km long MAHSR Bullet Train Project, which will connect Mumbai & Ahmedabad through 12 stations at the cost of Rs 1.1 lakh crores. The Bullet Train will cover a distance of 508 km in 2 hours & 7 mins with a maximum operational speed of 320 km/hr. 

Vishal Chaudhary, Co-Founder, Zetwerk, said, “As an organization that continually strives to make a sizeable impact in the ecosystem, Zetwerk is proud to associate with the Bullet Train Project and will strive to deliver its commitment on time, in full. India is on the cusp of a major manufacturing revolution and we are honoured to be able to play an active role in bolstering these capabilities and supporting the government’s development vision.” 

Founded with the vision to bring the fragmented manufacturing sector together and level the playing field for SMEs and MSMEs by connecting them with Fortune 500 companies, Zetwerk has come a long way in realising the government’s ‘Make in India’ dream. In the true spirit of making India ‘Atmanirbhar,’ Zetwerk has managed to create an ecosystem that solves the problems of a volatile manufacturing ecosystem by maintaining consistent demand, supporting capacity utilisation and reducing the burden of input credits for cash-strapped suppliers. 

The MAHSR corridor is the first High-speed rail corridor under implementation among the 12 planned High-speed Rail corridors in India. The execution period of the order envisages that the project will be completed by 2023. 

Apart from being a technological marvel, the High-Speed Rail (HSR) project would afford many quantifiable benefits like saving in travel time, vehicle operation cost, reduction in pollution, job creation, reduction in accidents/ enhanced safety, and imported fuel substitution, and reduction in pollutants. In addition, the project would also boost the infrastructure and add to the growth of the economy. NHSRCL aims to initially serve up to 17,900 passengers per day in each direction, which will be subsequently increased to 92,900 passengers per day in each direction by the year 2053. 

Related Stories

Other Industrial Products
Zetwerk eyes $1 billion IPO to boost growth

Zetwerk eyes $1 billion IPO to boost growth

The company’s platform facilitates connections between suppliers and clients across industries, including aircraft engine manufacturing, consumer electronics, and home appliances.

Read more
Aerospace Defence
L&T expands aerospace focus amid India’s $44 billion space market boom

L&T expands aerospace focus amid India’s $44 billion space market boom

The first launch of a privately built PSLV is expected in early 2025, with each rocket costing approximately Rs 2 billion.

Read more
Automation & Robotics
L&T to acquire 21% stake in E2E Networks in Rs 13.27 billion deal

L&T to acquire 21% stake in E2E Networks in Rs 13.27 billion deal

E2E Networks specialises in CPU and GPU-based cloud computing platforms, leveraging its relationship with NVIDIA to support large-scale general and AI workloads.

Read more

Related Products

Auto Casting Components

CASTINGS & FORGINGS

Micro Melt offers a wide range of auto parts casting components.

Read more

Request a Quote

Robofinish Iron Casting Fettlingrcf

CASTINGS & FORGINGS

Grind Master Machines Pvt Ltd offers a wide range of robofinish iron casting fettling CF-HD series.

Read more

Request a Quote

Casting Components

CASTINGS & FORGINGS

Micro Melt offers a wide range of auto parts casting components. Read more

Request a Quote

Hi There!

Now get regular updates from IPF Magazine on WhatsApp!

Click on link below, message us with a simple hi, and SAVE our number

You will have subscribed to our Industrial News on Whatsapp! Enjoy

+91 84228 74016