Tata Passenger Electric Mobility commences production at new facility in Gujarat

  • Industry News
  • Jan 17,24
This event marks a significant milestone for the company and was celebrated with the roll-out of the first Tata branded car from this world class facility.
Tata Passenger Electric Mobility commences production at new facility in Gujarat

Tata Passenger Electric Mobility (TPEM), a subsidiary of Tata Motors, India’s leading automobile company, announced the start of production of passenger vehicles from its new factory in Sanand, Gujarat. This event marks a significant milestone for the company and was celebrated with the roll-out of the first Tata branded car from this world class facility, in the presence of TPEM Managing Director, Shailesh Chandra and the leadership team from the Passenger and Electric vehicles businesses.   
 
Commenting on this momentous occasion, Shailesh Chandra, Managing Director, Tata Motors Passenger Vehicles & Tata Passenger Electric Mobility said, “Witnessing the first car roll out of the new TPEM facility in Sanand is a proud moment for us. We have successfully retooled the factory in the shortest span of 12 months, taking it to new level to accommodate a wide range of existing products and future new models to come. I extend my heartfelt gratitude to the Government of Gujarat for its wholesome support and our employees without whom this accomplishment would not have been possible. I am confident that this facility will play a pivotal role in steering Tata Motors, especially TPEM, towards achieving newer feats.”

He further added,” Tata Motors Passenger & Electric Vehicles business has delivered market beating growth over the last few years. We have strong plans to sustain this momentum, with our robust pipeline of future ready “New Forever” products and proactive investments in electric vehicles. With existing capacities near saturation, this new facility will unlock an additional state-of-the-art manufacturing capacity of 300,000 units per annum which is scalable to 420,000 units per annum.”

Situated in the industrial hub, GIDC Sanand with access to a strong network of suppliers, this new facility was acquired from Ford India, on January 10, 2023. Spread across 460 acres, it will be Tata Motors’ second plant in Gujarat to manufacture ICE and EV models. The plant houses four main shops - Stamping, Body construction, Paint and Final assembly shop and they are equipped with high level of automation and latest technology, to ensure precision manufacturing. This facility has implemented several world-class technologies that will set a new benchmark within the industry.

Major retooling and tech upgrades include: 
Press shop – New dies for stamping critical skin panels 
Weld shop – Modification of all lines with additional robots, new grippers and fixtures have been added
Paint shop – Modification of handling systems, external robot programming, internal robotic painting and waxing set up
Assembly shop – Modification of handling systems and end of line system 

The plant currently has more than 1000 employees (includes staff and technicians) and will create 1000 additional jobs in the next 3 to 4 months in the region, in line with the production ramp up plans. Tata Motors has invested in up skilling its workforce by providing them with Diploma, Bachelor of Engineering and Master’s Degree, as applicable. In line with Tata Motors’ commitment to sustainability, 50 KW solar rooftop is installed in the plant. This is a water neutral plant and is expected to be water positive by December 2024.

Related Stories

Hydraulic & Pneumatics
Germany’s Mayr Power Transmission opens plant in India

Germany’s Mayr Power Transmission opens plant in India

The new plant will produce safety brakes and clutches for the local market, ensuring safety and reliability in machines and systems.

Read more
Electrical & Electronics
Waaree begins trial production at Gujarat solar cell manufacturing facility

Waaree begins trial production at Gujarat solar cell manufacturing facility

At 5.4 GW capacity, the plant attains the position as India’s largest advanced solar cell manufacturing facility.

Read more
Auto & Auto Components
Govt approves Rs 2.46 billion PLI incentive for M&M, Tata Motors

Govt approves Rs 2.46 billion PLI incentive for M&M, Tata Motors

The PLI scheme, launched on September 15, 2021, is designed to strengthen India’s manufacturing capabilities in AAT products, improve cost competitiveness, and develop a robust supply chain.

Read more

Related Products

Tata Motors unveils facilities for development of Hydrogen propulsion tech

AUTO COMPONENTS & ACCESSORIES

Tata Motors, India?s largest automobile company, unveiled two state-of-the-art & new-age R&D facilities for meeting its mission of offering sustainable mobility solutions. The unveilings constitute of Read more

Request a Quote

Tata Motors plans petrol powertrain for Harrier and Safari SUVs

AUTO COMPONENTS & ACCESSORIES

Tata Motors is in the process of developing a new petrol powertrain for its premium sports utility vehicles, the Harrier and Safari, as confirmed by a senior company official. Currently, these models Read more

Request a Quote

Electric Vehicle Charger

AUTO COMPONENTS & ACCESSORIES

RRT Electro is engaged in manufacturing of customized Power Electronic Products over two decades having capability to Design, Develop, Prototyping, Regulatory Compliance testing & Certification, Manuf Read more

Request a Quote

Hi There!

Now get regular updates from IPF Magazine on WhatsApp!

Click on link below, message us with a simple hi, and SAVE our number

You will have subscribed to our Industrial News on Whatsapp! Enjoy

+91 84228 74016