Grew Energy secures Rs 3,800 cr investment for 2.8 GW Solar Manufacturing Unit in Gujarat

  • Industry News
  • Jan 17,24
The agreement outlines Grew Energy's plans to establish a solar component manufacturing unit with a 2.8 GW capacity in Dholera by 2025.
Grew Energy secures Rs 3,800 cr investment for 2.8 GW Solar Manufacturing Unit in Gujarat

At the Vibrant Gujarat Global Summit, Grew Energy formalized a Memorandum of Understanding valued at Rs 3,800 crore in the presence of Chief Minister Bhupendra Patel. The agreement outlines Grew Energy's plans to establish a solar component manufacturing unit with a 2.8 GW capacity in Dholera by 2025. The Gujarat government, through this MoU, will facilitate necessary clearances and expedite the establishment process of the unit.

This significant investment, the largest in Grew Energy's history, will be funded through a combination of internal accruals and external financing. The company anticipates creating employment opportunities for more than 1,600 individuals in and around Dholera. Vinay Thadani, Director and CEO of Grew Energy Private, expressed gratitude to the government of Gujarat for their support and commitment to ensuring a smooth establishment of the manufacturing unit.

Thadani emphasized the historic significance of the Vibrant Gujarat Global Summit '24 for Grew Energy and outlined plans to commence the establishment process of the Dholera unit in 2025. This venture is expected to be a cornerstone for the company's growth and future expansion, contributing significantly to its vision of becoming a leading player in the country's renewable energy ecosystem.

Established in 2022, Grew Energy, the renewable arm of the Chiripal Group, is on a trajectory to become a major player in the renewable energy sector. The company has already initiated a 1.2 GW module manufacturing facility in Dudu, near Jaipur, Rajasthan, with plans to add another 1.6 GW at the same location. Additionally, Grew Energy recently announced a 3.2 GW manufacturing unit in Dholera, Gujarat, bringing the total manufacturing capacity to 6 GW by March 2025.

Source: ET Energy World

Related Stories

Aerospace Defence
Suzuki Motors starts manufacturing of Flying ‘Skycar’ in Japan

Suzuki Motors starts manufacturing of Flying ‘Skycar’ in Japan

The Skycar, offering a 15-minute flight time covering approximately 15 kilometres, accommodates two passengers and operates using 12 motors and rotors, achieving a top cruising speed of 100 kmph

Read more
Policy Regulation
Tamil Nadu tops in number of factories, Gujarat excels in industrial output

Tamil Nadu tops in number of factories, Gujarat excels in industrial output

The ASI report also points out that in FY22, 20 per cent of India’s factories, close to 50,000, were not operational

Read more
Railways
Railway Minister Vaishnaw visits locomotive manufacturing unit in Gujarat

Railway Minister Vaishnaw visits locomotive manufacturing unit in Gujarat

The Railways factory manufactured 1200 high horse power (9000 HP) electric locomotives over a period of 11 years. It would entail manufacturing of 1200 locomotives and maintenance of these locomotiv..

Read more

Related Products

Power Conversion Systems

POWER GENERATION & ENERGY CONSERVATION PRODUCTS

POM Systems & Services Pvt Ltd offers a wide range of PCS power conversion systems energy storage.

Read more

Request a Quote

Hot Water Generators

POWER GENERATION & ENERGY CONSERVATION PRODUCTS

Transparent Energy Systems Private Limited offers a wide range of Hot water generators - Aquawarm Superplus.


Read more

Request a Quote

Scrap Baling Press

POWER GENERATION & ENERGY CONSERVATION PRODUCTS

Fluid Power Machines offers hydraulic scrap baling press. Read more

Request a Quote

Hi There!

Now get regular updates from IPF Magazine on WhatsApp!

Click on link below, message us with a simple hi, and SAVE our number

You will have subscribed to our Industrial News on Whatsapp! Enjoy

+91 84228 74016

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back