India's first 250 kmph bullet train set to be built in Bengaluru

  • Industry News
  • Sep 20,24
Manufacturing will take place at BEML's Bengaluru plant, with the project slated for completion in 2.5 years.
India's first 250 kmph bullet train set to be built in Bengaluru

Bengaluru is gearing up to manufacture India's first high-speed bullet train, with BEML-Medha Servo Drives expected to produce two train rakes capable of speeds up to 250 kmph. These trains will be used for the Mumbai-Ahmedabad High-Speed Rail (MAHSR) corridor, a major infrastructure project overseen by the National High-Speed Rail Corporation Limited (NHSRCL).

The Integral Coach Factory (ICF) invited tenders earlier in September to build two chair-car high-speed trains. BEML has been the sole bidder for the contract, which is expected to be finalised shortly. Manufacturing will take place at BEML's Bengaluru plant, with the project slated for completion in 2.5 years. The trains, made from stainless steel, will have a design speed of 280 kmph and operate at 250 kmph.

The 508 km MAHSR corridor will connect Mumbai and Ahmedabad via 12 stations, with an estimated project cost of Rs 1.1 trillion. Initially, Japanese Shinkansen E5 trains were planned for the route, but due to high costs, the Indian government opted for domestic production. BEML will construct the carbody, while Medha will develop the propulsion system, leveraging its experience with the Vande Bharat trains.

The first train is expected to roll out by December 2026, with trials on the Surat-Bilimora section of the MAHSR line. Future orders for the Mumbai-Ahmedabad route, as well as other high-speed corridors, are anticipated, with potential export markets in Southeast Asia and Africa.
(moneycontrol)

Related Stories

Railways
Texmaco Rail Secures Rs 1.32 billion BLSS Wagon Order from TTRL

Texmaco Rail Secures Rs 1.32 billion BLSS Wagon Order from TTRL

Texmaco Rail & Engineering Limited has secured an order worth Rs 1.32 billion, excluding taxes, from Touax Texmaco Railcar Leasing Private Limited (TTRL) for the supply of a rake comprising BLSS and..

Read more
Construction Equipment
EXCON 2025 Set to Drive India’s Next Phase of Infrastructure Modernisation

EXCON 2025 Set to Drive India’s Next Phase of Infrastructure Modernisation

EXCON continues to be a transformative force in the construction equipment sector, driving the adoption of cutting-edge technology and modern machinery critical for accelerating India’s infrastruc..

Read more
Smart Manufacturing
India’s Top 100 Engineering Companies 2025 by Smart Manufacturing & Enterprises

India’s Top 100 Engineering Companies 2025 by Smart Manufacturing & Enterprises

FY25 unfolded against a challenging external setting. Despite the global headwinds, India posted real GDP growth of 6.5 per cent in FY2024–25. In this edition, Smart Manufacturing & Enterprises (S..

Read more

Related Products

Carbide Burrs

ABRASIVES & FINISHING EQUIPMENT

SRT Industrial Tools & Equipments offers a wide range of carbide burrs.


Read more

Request a Quote

Jamshedji Soil Compactor

ABRASIVES & FINISHING EQUIPMENT

Jamshedji Constro Equip Pvt Ltd offers a wide range of jamshedji soil compactor.


Read more

Request a Quote

Ground Pins

ABRASIVES & FINISHING EQUIPMENT

Hans Machineries Private Limited offers a wide range of pins, hardened & ground. Read more

Request a Quote

Hi There!

Now get regular updates from IPF Magazine on WhatsApp!

Click on link below, message us with a simple hi, and SAVE our number

You will have subscribed to our Industrial News on Whatsapp! Enjoy

+91 84228 74016