Reservoir Monitoring and Control System

  • The system given is of State of the art technology PLC & SCADA at Dam Control Room and Power House Control Room for Hydro Mechanical equipment operation and automation
  • Maintains reservoir level by measuring water level by contactless Radar type level transmitter and controlling the 3 x radial gates through hydraulic gate lifting system local control panel supplied by others
  • Transmits the reservoir level analog signal from Dam control room to the power house control room, wirelessly, using internet technology with backup of SIM based GSM/GPRS RTU technology
  • Ensures intake emergency and service gates are opened after ensuring, the levels are appropriate at both inlet and outlet.

Products from Pyramid Control System Private Limited

Verified

Automation Products

Deburring, Drilling, Boring, Tapping and Threading Machines

Read more

Request a Quote
Verified

Safety & Security Products

Deburring, Drilling, Boring, Tapping and Threading Machines

Read more

Request a Quote
Verified

Instrumentation Products

Deburring, Drilling, Boring, Tapping and Threading Machines

Read more

Request a Quote

Products from MACHINE TOOLS, POWER & HAND TOOLS Category

Verified

Perforated Metal Facades

Deburring, Drilling, Boring, Tapping and Threading Machines

Read more

Request a Quote
Verified

Rotary Broaching Tool

Deburring, Drilling, Boring, Tapping and Threading Machines

Read more

Request a Quote
Verified

Polygon Turning Machine - TPT-5S, TPT-5ST

Deburring, Drilling, Boring, Tapping and Threading Machines

Read more

Request a Quote

Hi There!

Now get regular updates from IPF Magazine on WhatsApp!

Click on link below, message us with a simple hi, and SAVE our number

You will have subscribed to our Industrial News on Whatsapp! Enjoy

+91 84228 74016